Air Traffic Flow Management (ATFM) is an ATM service established with the objective of contributing to a safe, orderly and expeditious flow of air traffic by ensuring that ATC capacity is utilised to the maximum extent possible, and that the traffic volume is compatible with the capacities declared by the appropriate ATS authority.
With the integration of capacity management, ATFM has developed into Air Traffic Flow and Capacity Management (ATFCM). The emphasis of ATFCM is on balancing the management of capacity and demand, planned strategically and applied tactically as a result of physical airport or airspace limitations.
ATFCM will be the primary means of ensuring flight punctuality and efficiency whilst maintaining or improving safety. In order to achieve this, more work is done in adjusting capacity to meet the demand by means of long-term and short-term rerouting. Only when no other option is available an ATFCM regulation will be introduced and a CTOT issued (slot allocation).
ATFCM has 3 phases:
a. | Strategic Flow Management: | Strategic Flow Management takes place seven or more days prior to the day of operation and includes research, planning and co-ordination activities. |
---|---|---|
b. | Pre-Tactical Flow Management: | Pre-Tactical Flow Management is applied during the six days prior to the day of operation and consists of planning and co-ordination activities. |
c. | Tactical Flow Management: | Tactical Flow Management is applied on the day of the operation. This phase updates the daily plan according to the actual traffic and capacity. The management of the traffic is made through ATFCM slot allocation and/or ad-hoc re-routings. |
Collaborative Decision Making (CDM) is the process, which allows decisions to be taken by those best positioned to make them on the basis of the most comprehensive, up to date and accurate information. This will enable decisions about a particular flight to be made according to the latest information available at the time, thereby enabling the flight to be dynamically optimised to reflect near or real-time events. This CDM process is a key enabler of the ATFCM strategy allowing the sharing of all relevant information between the parties involved in making decisions and supporting a permanent dialogue between the various partners throughout all phases of flight.
The general ATFM procedures which apply throughout the ICAO European Region are published in the ICAO Doc 7030, Regional Supplementary Procedures (Europe). Specific Network Manager procedures and information can be found in the Network Operations Handbook, available on the Network Operations Portal (NOP): https://www.public.nm.eurocontrol.int/PUBPORTAL/.
Those flow management procedures that are specific for flights departing from the Netherlands are included in section 2. For general information consult the documents above.
The Network Manager, in cooperation with Amsterdam FMP at Amsterdam ACC, is responsible for the execution of ATFCM measures within the Amsterdam FIR.
Amsterdam FMP will:
Central Flow Help Desk Service 1) | Network Manager addresses for ATFM messages | Amsterdam FMP 2) |
---|---|---|
Primary point of contact: E-help desk via Network Operations Portal (NOP) Secondary point of contact: OPS Tel: + 32(0)2745 1901 | AFS: EUCHZMTA SITA: BRUEA7X | Post: LVNL Tel: + 31 (0)20 406 2195 AFS: EHAAZDZX |
|
For the impact of flow management procedures on flight plans please see ENR 1.10.
Information with respect to ATFCM measures can be obtained from Amsterdam FMP or the ARO responsible for the departure aerodrome (see ENR 1.10, paragraph 1.1.2.4). The following ATFCM measures can be distinguished:
a. | Re-routing: | A (mandatory or advisory) diversion from the route in the original flight plan to off load capacity critical area(s). |
---|---|---|
b. | Level capping: | A (mandatory or advisory) diversion from altitude in the original flight plan to off load capacity critical ATC sectors. |
c. | Slot allocation: | During slot allocation procedures, the departure slot is issued as a calculated take-off time (CTOT). The CTOT is a nominal time with a tolerance of -5 to +10 minutes, which is primarily intended to enable ATC to allow for aerodrome congestion problems. |
The CTOT is issued not earlier than 2 hours before EOBT. The CTOT is included in a slot allocation message (SAM) or in a slot revision message (SRM), which is sent by the Network Manager to:
Furthermore, ATC is informed about the issued CTOT.
If it is foreseen that, due to operators reason, the flight cannot be ready in time to comply with the CTOT, the following procedures apply (see the Network Operations Handbook, part 'ATFCM Users Manual'):
It is the responsibility of the aircraft operators to:
The CTOT is part of the en-route clearance and will be taken into account by ATC at the departure aerodrome.
The STS indicator in flight plan item 18 is used to indicate the necessity for special handling. To ensure correct automatic processing, standardised abbreviations have been created. (see ENR 1.10, paragraph 3.2.8).
The decision to use a particular status indicator is the responsibility of the aircraft operator. Unauthorised use of any of these indicators with the intention of avoiding flow regulations is considered a serious breach of procedure and shall be dealt with accordingly.
To be exempted from ATFCM measures, and obtain an STS/ATFMX status, Amsterdam FMP should be contacted and the procedure in the ATFCM Users Manual chapter "ATFM Exemptions" should be followed. See ENR 1.10 section 3.2.8 for flight plan filing procedures.
Aircraft operators must be aware of the fact that the non-issuing of a CTOT on the basis of a status indicator for a flight on a filed route for which regulations are in force, will cause (additional) delay for other flights or ATC constraints on the regulated route parts.
Although no prior approval is needed, LVNL constantly reviews the flight plans of flights operated using status indicators. Aircraft operators may be requested to justify the use of a given indicator for a given flight at any time within 6 months following the operation.
A Network Manager operational problem is defined as a significant occurrence affecting an ATS unit, an AO, an FMP or the Network Manager, resulting from an occurrence in the provision of ATFM service, data processing and distribution function or other operational services.
A Network Manager operational problem report may be originated by an ATS unit, an aircraft operator, an FMP or the Network Manager. AOs and ATC units wishing to file a Network Manager operational problem report about an incident within the Amsterdam FIR can send the report directly to the Network Manager, or may contact Amsterdam FMP at Amsterdam ACC. In the latter case, Amsterdam FMP will collect all essential information and data and forward it to the Network Manager.
In case the Enhanced Tactical Flow Management System (ETFMS) fails, the ATFCM procedural contingency plan starts operating and the following procedures will be applied:
The ATFCM procedural contingency plan operates in the following four phases:
Having been notified of an ETFMS system failure, the Network Manager Operation Center (NMOC) at EUROCONTROL will send a pre-formatted ALERT FLASH message to FMPs, ATS units and AOs, advising them about the situation and to be prepared for the ACTIVATION phase. This message will include a Provisional Contingency plan Start Time (PCST).
If it is confirmed that the ETFMS system failure is likely to continue, the Network Manager Operation Center (NMOC) at EUROCONTROL will send a pre-formatted ACTIVATION FLASH message to FMP controllers, ATS units and AOs, ordering activation of the ATCFM procedural contingency plan. The contingency plan start time (CST) will be clearly specified in the ACTIVATION FLASH message. During the ACTIVATION phase, ATC will continue to honour those calculated take-off times (CTOT) which fall within the period up to CST.
The OPERATIONAL CONTINGENCY phase starts at CST. Any CTOT that has been issued before and falls after CST, will be ignored. For all flights to depart from an aerodrome in the Netherlands and after CST, the AO shall request Amsterdam FMP for a "departure slot time" by means of phone.
Example: "Request slot time for ABC123, departure EHAM, destination EDDF, EOBT 1234 UTC".
When a CTOT or a departure slot time can not be met, Amsterdam FMP shall be contacted.
Once the ETFMS system has been declared operational, the Network Manager Operation Center (NMOC) at EUROCONTROL will send a pre-formatted RECOVERY FLASH message to FMPs, ATS units and AOs. This message will include the ETFMS recovery time (ERT) and details about the transition to the CTOT procedure. The transition time to the CTOT procedure will normally be ERT + 1 hour. Until ERT + 1, flights will depart in accordance with the departure slot time received from Amsterdam FMP. After ERT + 1 a departure slot time received from Amsterdam FMP, will be replaced by a CTOT.
As soon as possible after receipt of a RECOVERY FLASH message, AOs should ensure that a flight plan CHG/DLA message is sent for flight plans with EOBT of ERT + 1 hour or later. This will trigger SAM/SRM for flights on regulated routes.
It is possible for aircraft operators to obtain an exclusion from ATFCM measures for aircraft with destination AMSTERDAM/Schiphol (see EHAM AD 2.22 paragraph 2.3.4). These flow exclusion procedures are subject to a service level agreement (SLA) between aircraft operator and LVNL. To obtain a SLA contact:
LVNL
Procedures
P.O. Box 75200
1117 ZT Schiphol Airport
The Netherlands
Email: [email protected]