AIP Supplement
NETHERLANDS

AIP SUP

19/2024

Publication date 27 JUN 2024

RECONSTRUCTION ENTRY/EXIT R-APRON AND MAINTENANCE RWY 06/24

1 INTRODUCTION

This section supplements the following portion(s) of the AIP:EHAM.

Due to the creation of a dual taxiway at the south-west side of the airport, major reconstruction works are carried out. This includes the R-apron, RWY 06/24, taxiway exits S1/S2 and the taxiways in that area.

Work will be carried out into the year 2027; in the period JUN-DEC 2024 the works are carried out in phases as described below. The actual date and time will be promulgated by NOTAM.

A new AIP Supplement will be published for additional phases.

2 CONSTRUCTION PHASES

PHASE 1, 2, 3:
Work is completed.

PHASE 4:
Work is carried out on TWY S1 and S2 and the entry/exit to the R-apron. The availability is as follows:



PHASE 5:
Work is carried out on TWY S10 with no operational consequences. The availability is as follows:



PHASE 6:
Work continues to end of year. The availability is as follows:



PHASE 7:
Work is carried out on TWY A3. The availability is as follows:



PHASE 8:
No work with operational consequences. The availability is as follows:



3 DOCUMENT CONTROL

REF AIP AD 2.EHAM-ADC, AD 2.EHAM-APDC.1, AD 2.EHAM-GMC.x.

Consult NOTAM for latest information.

AIP SUP 01/2024 is cancelled herewith.

ISSN: 0165-7291