Due to the creation of a dual taxiway at the south-west side of the airport, major reconstruction works are carried out. This includes the aircraft stands on the R-apron, remote holding positions P20-P23 including the direct access to P22 and P23 from TWY Q.
|
||||||||||||||
|
Further construction work will be carried out on TWY A from A28 up to and including TWY Q, and TWY B between A28 and TWY Q.
|
||||||||||||||
|
Work will be carried out into the year 2027. In the period
JAN 2026 -
SEP
2027
,
the works are carried out in phases as described below. The actual date and time of the phases will be promulgated by NOTAM.
A new AIP Supplement will be published for additional phases. |
||||||||||||||
|
PHASE 26.1:
Work is carried out on: All aircraft stands on the R-apron, remote holding positions P20 - P23 and the direct access to P23 and P22 from TWY Q. |
||||||||||||||
|
PHASE 26.2:
Work is carried out on: TWY A between TWY A28 and TWY A29, TWY Q, R-apron. |
||||||||||||||
|
PHASE 27.0:
Work is carried out on: TWY A between TWY A28 and TWY A29, TWY Q, R-apron. |
||||||||||||||
|
PHASE 27.1:
Work is carried out on: TWY A between TWY A28 and TWY A29, TWY Q. |
||||||||||||||
|
The availability is as follows:
|
||||||||||||||
|
REF AIP AD 2.EHAM-ADC, AD 2.EHAM-APDC.1, AD 2.EHAM-GMC.x.
Consult NOTAM for latest information. AIP SUP 30/2025 is cancelled herewith. |
||||||||||||||